Andover, MA · Demolition permit
Andover, MA demolition permit checklist
13 required items. Read from the town's pages on 09/27/2026.
In the packet (4)
- Workers' compensation affidavit, signed BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
- Site plan showing what is being demolished and what remains 780 CMR 51.00 Massachusetts Residential Code (10th ed.), Chapter R1 Scope and Application (unofficial copy)
- Conservation Commission sign-off General Procedures for Obtaining a Building Permit (revised Nov 10, 2017)
- Board of Health sign-off General Procedures for Obtaining a Building Permit (revised Nov 10, 2017)
Filed on OpenGov Permitting & Licensing (formerly ViewPoint Cloud) (2)
- Building permit application, completed, signed and dated Mass.gov: Building permit applications for non-state-owned buildings
- Debris disposal facility named M.G.L. c.40 s.54
Only when it applies (7)
- Owner authorization for the contractor to apply (when Is the work being done by a contractor (not the homeowner): yes) BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
- Homeowner exemption affidavit (when Is the work being done by a contractor (not the homeowner): no) Homeowners' Exemption Eligibility Affidavit - Sample (DOCX)
- Construction Supervisor License number on the application, current (when Is the work being done by a contractor (not the homeowner): yes) 780 CMR 10th ed. Chapter 110.R5 Licensing of Construction Supervisors (unofficial copy)
- Supervisor license covers demolition (when Is the work being done by a contractor (not the homeowner): yes) Mass.gov: Learn about different Construction Supervisor Licenses
- Signed contract or cost breakdown (when Is the work being done by a contractor (not the homeowner): yes) Andover Building Permit Checklist (updated 1/1/2025), incl. department review matrix
- Certificate of liability insurance, current (when Is the work being done by a contractor (not the homeowner): yes) Andover Building Permit Checklist (updated 1/1/2025), incl. department review matrix
- Historic Commission or historic district sign-off (when Is the property in a historic district, or is the building 50 or more years old: yes) Andover, MA (api-east.viewpointcloud.com)