Andover, MA · New home (1-2 family) permit
Andover, MA new home (1-2 family) permit checklist
17 required items. Read from the town's pages on 09/27/2026.
In the packet (9)
- Workers' compensation affidavit, signed BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
- Construction drawings, drawn to scale and dimensioned 780 CMR 51.00 Massachusetts Residential Code (10th ed.), Chapter R1 Scope and Application (unofficial copy)
- Drawings stamped by a registered architect or engineer Andover Building Permit Checklist (updated 1/1/2025), incl. department review matrix
- Energy code compliance documentation Andover Building Permit Checklist (updated 1/1/2025), incl. department review matrix
- Certified plot plan, stamped by a registered land surveyor Andover Building Permit Checklist (updated 1/1/2025), incl. department review matrix
- Structural details: framing, beams and headers Andover Building Permit Checklist (updated 1/1/2025), incl. department review matrix
- Conservation Commission sign-off General Procedures for Obtaining a Building Permit (revised Nov 10, 2017)
- Board of Health sign-off General Procedures for Obtaining a Building Permit (revised Nov 10, 2017)
- Fire department sign-off General Procedures for Obtaining a Building Permit (revised Nov 10, 2017)
Filed on OpenGov Permitting & Licensing (formerly ViewPoint Cloud) (1)
- Building permit application, completed, signed and dated Mass.gov: Building permit applications for non-state-owned buildings
Only when it applies (7)
- Owner authorization for the contractor to apply (when Is the work being done by a contractor (not the homeowner): yes) BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
- Homeowner exemption affidavit (when Is the work being done by a contractor (not the homeowner): no) Homeowners' Exemption Eligibility Affidavit - Sample (DOCX)
- Construction Supervisor License number on the application, current (when Is the work being done by a contractor (not the homeowner): yes) 780 CMR 10th ed. Chapter 110.R5 Licensing of Construction Supervisors (unofficial copy)
- Flood zone and design flood elevation shown (when Is any part of the lot in a FEMA flood hazard zone: yes) 780 CMR 51.00 Massachusetts Residential Code (10th ed.), Chapter R1 Scope and Application (unofficial copy)
- Signed contract or cost breakdown (when Is the work being done by a contractor (not the homeowner): yes) Andover Building Permit Checklist (updated 1/1/2025), incl. department review matrix
- Certificate of liability insurance, current (when Is the work being done by a contractor (not the homeowner): yes) Andover Building Permit Checklist (updated 1/1/2025), incl. department review matrix
- Historic Commission or historic district sign-off (when Is the property in a historic district, or is the building 50 or more years old: yes) Andover, MA (api-east.viewpointcloud.com)