Boston, MA · Deck or porch permit

Boston, MA deck or porch permit checklist

15 required items. Read from the town's pages on 09/28/2026.

In the packet (4)

  1. Workers' compensation affidavit, signed BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
  2. Deck plan with footing, framing and ledger details ICC 2021 International Residential Code, Chapter 5 Floors (as adopted by 780 CMR 51.00)
  3. Permit fee Long-Form Permit | Boston.gov
  4. Certified plot plan, stamped by a registered land surveyor ISD Building Permit Application Checklist (Plans and Zoning)

Filed on Boston Inspectional Services Department online portal (Online Permits and Licenses) (2)

  1. Building permit application, completed, signed and dated Mass.gov: Building permit applications for non-state-owned buildings
  2. Debris disposal facility named M.G.L. c.40 s.54

Only when it applies (9)

  1. Owner authorization for the contractor to apply (when Is the work being done by a contractor (not the homeowner): yes) BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
  2. Homeowner exemption affidavit (when Is the work being done by a contractor (not the homeowner): no) Homeowners' Exemption Eligibility Affidavit - Sample (DOCX)
  3. Construction Supervisor License number on the application, current (when Is the work being done by a contractor (not the homeowner): yes) 780 CMR 10th ed. Chapter 110.R5 Licensing of Construction Supervisors (unofficial copy)
  4. Home Improvement Contractor registration number (when Is the work being done by a contractor (not the homeowner): yes; Is it an existing, owner-occupied 1-4 unit home: yes) M.G.L. c.142A s.13 (Registration records; building permits)
  5. Flood zone and design flood elevation shown (when Is any part of the lot in a FEMA flood hazard zone: yes) 780 CMR 51.00 Massachusetts Residential Code (10th ed.), Chapter R1 Scope and Application (unofficial copy)
  6. Signed contract or cost breakdown (when Is the work being done by a contractor (not the homeowner): yes) Short-Form Permit | Boston.gov
  7. Copy of the Construction Supervisor License (when Is the work being done by a contractor (not the homeowner): yes) Short-Form Permit | Boston.gov
  8. Certificate of liability insurance, current (when Is the work being done by a contractor (not the homeowner): yes) Electrical Permit | Boston.gov
  9. Boston contractor affidavits: Site Safety Plan, Mattocks-Higgins workplace safety, and experience rating form (when Is the work being done by a contractor (not the homeowner): yes) Short-Form Permit | Boston.gov

Check my packet against this list, $79