Cambridge, MA · Demolition permit

Cambridge, MA demolition permit checklist

14 required items. Read from the town's pages on 09/28/2026.

In the packet (4)

  1. Workers' compensation affidavit, signed Cambridge ISD Permit Application Checklist (building, roof, siding, demolition, solar, tent) v. 10/16/18
  2. Site plan showing what is being demolished and what remains 780 CMR 51.00 Massachusetts Residential Code (10th ed.), Chapter R1 Scope and Application (unofficial copy)
  3. Pest control (rodent) report Cambridge ISD Permit Application Checklist (building, roof, siding, demolition, solar, tent) v. 10/16/18
  4. Utility disconnect confirmations Cambridge ISD Permit Application Checklist (building, roof, siding, demolition, solar, tent) v. 10/16/18

Filed on OpenGov Permitting & Licensing (formerly ViewPoint Cloud) (2)

  1. Building permit application, completed, signed and dated Mass.gov: Building permit applications for non-state-owned buildings
  2. Debris disposal facility named M.G.L. c.40 s.54

Only when it applies (8)

  1. Owner authorization for the contractor to apply (when Is the work being done by a contractor (not the homeowner): yes) BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
  2. Homeowner exemption affidavit (when Is the work being done by a contractor (not the homeowner): no) Homeowners' Exemption Eligibility Affidavit - Sample (DOCX)
  3. Construction Supervisor License number on the application, current (when Is the work being done by a contractor (not the homeowner): yes) 780 CMR 10th ed. Chapter 110.R5 Licensing of Construction Supervisors (unofficial copy)
  4. Supervisor license covers demolition (when Is the work being done by a contractor (not the homeowner): yes) Mass.gov: Learn about different Construction Supervisor Licenses
  5. Copy of the Construction Supervisor License (when Is the work being done by a contractor (not the homeowner): yes) Cambridge ISD Permit Application Checklist (building, roof, siding, demolition, solar, tent) v. 10/16/18
  6. Signed contract or cost breakdown (when Is the work being done by a contractor (not the homeowner): yes) Cambridge ISD Permit Application Checklist (building, roof, siding, demolition, solar, tent) v. 10/16/18
  7. Lead safety documentation for pre-1978 work (when Was the building built before 1978: yes) Cambridge ISD Permit Application Checklist (building, roof, siding, demolition, solar, tent) v. 10/16/18
  8. Historic Commission or historic district sign-off (when Is the property in a historic district, or is the building 50 or more years old: yes) Demolition Application Requirements - Cambridge Historical Commission