Plymouth, MA · New home (1-2 family) permit
Plymouth, MA new home (1-2 family) permit checklist
16 required items. Read from the town's pages on 09/27/2026.
In the packet (9)
- Workers' compensation affidavit, signed BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
- Construction drawings, drawn to scale and dimensioned New Residential Construction Checklist (Procedures for a New Home Building Permit, rev. 12/9/2021)
- Plot plan showing the work and distances to the lot lines 780 CMR 51.00 Massachusetts Residential Code (10th ed.), Chapter R1 Scope and Application (unofficial copy)
- Energy code compliance documentation New Residential Construction Checklist (Procedures for a New Home Building Permit, rev. 12/9/2021)
- Zoning review or zoning sign-off OpenGov record type: Zoning Permit (public API)
- Septic approval for the work New Residential Construction Checklist (Procedures for a New Home Building Permit, rev. 12/9/2021)
- Public works, water or sewer sign-off New Residential Construction Checklist (Procedures for a New Home Building Permit, rev. 12/9/2021)
- Structural details: framing, beams and headers New Residential Construction Checklist (Procedures for a New Home Building Permit, rev. 12/9/2021)
- Manufacturer specifications for the product being installed New Residential Construction Checklist (Procedures for a New Home Building Permit, rev. 12/9/2021)
Filed on OpenGov Citizen Services (formerly ViewPoint Cloud) (1)
- Building permit application, completed, signed and dated Mass.gov: Building permit applications for non-state-owned buildings
Only when it applies (6)
- Owner authorization for the contractor to apply (when Is the work being done by a contractor (not the homeowner): yes) BBRS Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Family Dwelling (PDF, marked 'Revised Mar 2011')
- Homeowner exemption affidavit (when Is the work being done by a contractor (not the homeowner): no) Homeowners' Exemption Eligibility Affidavit - Sample (DOCX)
- Construction Supervisor License number on the application, current (when Is the work being done by a contractor (not the homeowner): yes) 780 CMR 10th ed. Chapter 110.R5 Licensing of Construction Supervisors (unofficial copy)
- Flood zone and design flood elevation shown (when Is any part of the lot in a FEMA flood hazard zone: yes) 780 CMR 51.00 Massachusetts Residential Code (10th ed.), Chapter R1 Scope and Application (unofficial copy)
- Conservation Commission sign-off (when Is any work within 100 feet of a wetland, stream or pond: yes) New Residential Construction Checklist (Procedures for a New Home Building Permit, rev. 12/9/2021)
- Certificate of liability insurance, current, naming the town as certificate holder (when Is the work being done by a contractor (not the homeowner): yes) Residential Addition Checklist (Procedures for an Addition/Remodel Building Permit, rev. 12/9/2021)