Nashua, NH addition permit checklist
7 required items. Read from the town's pages on 09/27/2026.
In the packet (4)
- Building permit application, completed, signed and dated Building and Land Use Permit Application (PDF)
- Construction drawings, drawn to scale and dimensioned Plan Requirements - Residential, One and Two-Family Dwellings (PDF, May 2010, scanned)
- Energy code compliance form (EC-1 or equivalent) Plan Requirements - Residential, One and Two-Family Dwellings (PDF, May 2010, scanned)
- Structural details: framing, beams and headers Plan Requirements - Residential, One and Two-Family Dwellings (PDF, May 2010, scanned)
Only when it applies (3)
- Plot plan showing the work and distances to the lot lines (when Does the work change the building footprint or add floor area: yes) Building and Land Use Permit Application (PDF)
- State permit for the site (driveway, shoreland or wetlands) (when Is any work within 100 feet of a wetland, stream or pond: yes) RSA Chapter 482-A Fill and Dredge in Wetlands
- Flood zone and design flood elevation shown (when Is any part of the lot in a FEMA flood hazard zone: yes) Building and Land Use Permit Application (PDF)